Louisiana South Carolina
top of page
Search

Architectural Drafting Overflow Support During Peak Hospitality & Residential Deadlines

  • Writer: Karen Knowles
    Karen Knowles
  • 16 hours ago
  • 1 min read
Modern building sketch with stone facade, large windows, and potted plants. Trees and a clear sky in the background convey a calm mood.

Project Overview


A boutique US architecture studio experienced overlapping hospitality and residential project deadlines and required short-term architectural drafting outsourcing support to maintain schedule integrity.


Rather than hire temporary staff, the firm leveraged LynxPros for flexible production capacity.


Scope of Architectural Drafting Work

Services Provided


  • 2D AutoCAD drafting

  • Revit interior layout modeling

  • Construction detailing refinement

  • As-built updates

  • Redline incorporation

  • Weekly coordination calls with project manager


Timeline


  • Engagement Duration: 6 weeks

  • Average revision turnaround: 48 hours

  • Peak output: 18–22 sheets per week


Deliverables


  • Updated floor plans, elevations, and interior layouts

  • Coordinated construction detailing sheets

  • Organized digital file management structure

  • As-built revisions integrated into master set


What Improved


  • Maintained on-time delivery across two concurrent projects

  • Prevented internal team burnout

  • Reduced drafting backlog by approximately 35%

  • Preserved principal architect focus on client-facing activities

  • Avoided short-term hiring costs


This engagement highlights how architectural drafting outsourcing can stabilize production during peak workload cycles.

 
 
bottom of page